INVESTOR MEET COMPANY OCTOBER 2026 ‘BLP’:
Page 3
Disclaimer The information contained in these slides and the accompanying oral presentation (together, the "Presentation") have not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000 ("FSMA"). If any person is in any doubt as to the contents of this Presentation, they should seek independent advice from a person who is authorised for the purposes of FSMA and who specialises in advising on investments of this kind. The information contained in this document does not purport to cover all matters that may be relevant for the purposes of considering whether or not to make any prospective investment and is not intended to provide, and should not be relied upon, for accounting, legal or tax advice. This Presentation is supplied to you solely for information. The information contained in this Presentation has been prepared by Savannah Resources plc (the "Company"). The Presentation and any further confidential information made available to any recipient, either orally or in writing, must be held in complete confidence and documents containing such information may not be reproduced, used or disclosed without the prior written consent of the Company. The Presentation shall not be copied, published, reproduced or distributed in whole or in part, to any other person, for any purpose at any time. The information contained in the Presentation is not intended to be viewed by, or distributed or passed on (directly or indirectly) to, and should not be acted upon by any class of person other than (I) qualified investors (within the meaning of the Prospectus Regulation (EU) 2017/1129 and (ii) investment professionals falling within Article 19(5) and high net worth companies, unincorporated associations and partnerships and trustees of high value trusts falling within Article 49(2) respectively of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005 (or persons to whom it may otherwise be lawfully communicated) (together "Relevant Persons"). Persons who are not Relevant Persons should not attend the Presentation or rely on or act upon the matters communicated at the Presentation. By accepting the Presentation, you agree to be bound by these restrictions. The Presentation does not constitute an admission document, prospectus or listing particulars relating to the Company; it has not been approved by the London Stock Exchange or the Financial Conduct Authority, nor does it constitute or form part of any offer, invitation, inducement or commitment to, sell, issue, or any solicitation of any such offer or invitation to subscribe for, underwrite or buy, any shares in the Company or any of its affiliates to any person in any jurisdiction, nor shall it nor any part of it, nor the fact of its distribution form the basis of, or be relied on in connection with, or act as any inducement to enter into any contract or investment decision in relation thereto. No undertaking, assurance, representation or warranty, express or implied, is made or given by or on behalf of the Company, or SP Angel Corporate Finance LLP (‘SP Angel’), or any of their respective existing or proposed members, agents, affiliates, representatives, advisers, employees or directors or any other person as to the accuracy, completeness or fairness of the information or opinions contained in this Presentation and no responsibility or liability is accepted by any such person for any loss however arising from any use of, or reliance on, or in connection with, this Presentation or its contents or otherwise arising in connection therewith. Notwithstanding this, nothing in this paragraph shall exclude liability for any such undertaking, assurance, representation or warranty made fraudulently. SP Angel is regulated for the conduct of investment business in the UK by the Financial Conduct Authority, are acting exclusively for the Company and are not acting on behalf of any recipient or reader of this Presentation and will not be responsible to any person for providing the protections afforded to their customers or for advising any such person in connection with this matter. Any such person is recommended to seek their own independent legal, taxation and investment advice. Neither the receipt of this Presentation, nor any information contained therein or supplied with the Presentation or subsequently communicated to any person in connection with the Presentation either constitutes, or is to be taken as constituting, the giving of investment advice by SP Angel to any person. Certain statements in the Presentation are forward-looking statements, and the Presentation itself has been based upon a number of assumptions, forecasts and Projections of the Company which by their nature are forward- looking and should not be relied upon in isolation. Forward-looking statements are typically identified by the use of forward-looking terminology such as "believes", "expects", "may", "will", "could", "should", "intends", "estimates", "potential", "anticipate", "plans" or "assumes" or similar expressions, or by discussions of strategy that involve risk and uncertainties. By their nature, forward-looking statements, assumptions, forecasts and Projections involve a number of risks and uncertainties, and in some cases are based on estimates and incomplete information, that could cause actual results or events to differ materially from those expressed or implied by the forward-looking statements or by the Presentation as a whole. These risks and uncertainties, and the impact they have on the assumptions, forecasts and Projections contained in the Presentation, could adversely affect the outcome and financial effects of the plans and events described herein. The distribution of this document in certain jurisdictions may be restricted by law and therefore persons into whose possession this document comes should inform themselves about and observe any such requirements or restrictions and this document must not be distributed in or into any jurisdiction in which it would be unlawful. Any such distribution could result in a violation of the law of such jurisdictions. The securities referred to in this presentation have not been and will not be registered under the US Securities Act of 1933, as amended, (the "US Securities Act") or under any securities laws of any state or other jurisdiction of the US and may not be offered, sold, resold, taken up, exercised, renounced, transferred or delivered, directly or indirectly, within the US, Australia, Canada, Japan, the Republic of Ireland or the Republic of South Africa, or to, or for the account or benefit of, any person with a registered address in, or who is resident or ordinarily resident in, or a citizen of, the US, Australia, Canada, Japan, the Republic of Ireland or the Republic of South Africa, except pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the US Securities Act and/or any other applicable securities laws. 1
Page 4
Agenda • Key messages • Fundraise wrap up & recent/upcoming work • The main elements of the DFS • Financing Structure • Stakeholder engagement • Takeaways 2
Page 5
• Globally competitive – C1 & AISC costs in 2nd quartile of global cost curve2, lower than most producers, even in Australia, China, Africa; From within the EU; Achievable to-be- funded Capex (US$ 418M inc. contingency). Post-tax NPV8 US$913m & 43.2% IRR • Europe’s largest, Globally significant – Phase 1 DFS delivered , 20Mt Reserve, 14 years output at 183kt SC5.51, 39Mt Resource, Additional Exploration Target3 pointing to > 100Mt. Expansion capacity option built in and considered in DFS CAPEX • Validated & Supported at all levels – EU Strategic Project; Portuguese CPAI, Grant & Easements; German ECA & KfW LoI, Offtake with AMG (SC miner & LiOH refiner); Solid local ties & presence with >10 partnerships done; • Low execution risk, high optionality – Traditional Spodumene flow-sheet, Open pit; Experienced team; (slow but) very stable jurisdiction; ~US$53m in reserves4, clean balance sheet; 75% of the offtake unallocated & strongly supportive shareholder base • Post-DFS milestones & news flow ahead – Further value creation ahead. Project Financing, additional strategic partnerships, offtakes, community & other deals before year end. Production targeted for end 2028. …& then potential Phases 2 & 3 Porto Lisbon SPAIN EUROPE 1 2 3 4 5 3savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes 1. Data from July 2026 Phase 1 DFS; 2.Benchmark Mineral Intelligence, 2030 concentrate All -in-Sustaining cost curve including by-product credits (Q2 2026); 3. Cautionary Statement: The potential quantity and grade of the Exploration Targets is conceptual in nature, there has been ins ufficient exploration work to estimate a mineral resource and it is uncertain if further exploration will result in defining a mineral resource. 4. Pro-forma reserves position post September 2026 Fundraise (as per 25 Sept RNS). 5 Key messages on where we are right now Savannah’s “Barroso Lithium Project”
Page 6
Agenda • Key messages • Fundraise wrap up & current/upcoming work • The main elements of the DFS • Financing Structure • Stakeholder engagement • Takeaways 4
Page 7
Portugal, 27.9% UK, 23.3%Netherlands (AMG), 15.6% Spain, 15.5% Other Europe, 16.9% Other, 0.9% Fundraise participation by location US$40m fundraise lifts reserves to c.US$53m European investors contributed 99% of funds raised 5 1. Reserves, including short term treasuries, post September 2026 Fundraise (as per 25 Sept RNS). Including US$1.1m cash in short term treasuries. 2. In addition to the reserves, the Company holds US$6.6m in deposits pledged as collateral for bank guarantees related to the c ompulsory acquisition of land and the acquisition of the Aldeia licence. 4 Largest shareholders, 33.8% Financial Institutions, 55.8% Staff & Other, 0.5% Retail, 10.0% Fundraise participation by investor type • Fundraise was well supported by all investor types, including retail • Increases Savannah’s reserves (cash & short-term treasuries) by 4x to c.£40m/US$53m1,2; Shares in issue increased by 21% • All of Savannah’s largest shareholders participated • Placing to institutions was oversubscribed and partially scaled back • Portugal and UK contributed 51% of funds raised • Investment from Spanish institutions continued to grow • Funds from Switzerland, Denmark, France and Italy also participated • Additional reserves support development, contribute to construction finance and significantly de-risk Project delivery savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes
Page 8
Savannah’s Corporate Snapshot 100% focus on preparing the BLP for production 36.1% Other 0.5% SAV Staff 15.6% AMG 10.0% Telmory 9.0% Al Marjan 10.0% Pluris Investments 18.8% Other Instit. Investors A solid register built to support construction1 Continued momentum on delivery & derisking 4 very strong core shareholders: 1 strategic sector specialist A strong free float: 55% free float split between retail & institutions GBP 167M market cap @ 5.35 GBx, i.e. US$221M On AIM, working on dual-listing on a regulated market A growing base of institutional investors Strong commitment from core shareholders Institutional share has grown c.+4x since May-25 6 2024 2025 2026 0 50 100 150 200 250 300 350 400 Rebased to 100 (Jan-24) Savannah's relative share price performance since Jan-24 SAV FTSE 100 FTSE AIM All Share Li & Battery Tech ETF Spodumene price 2024 2025 2026 2 Portuguese industrial Conglomerates 1 long-term holder 1. At 7 Oct 2026 following US$40M Fundraise savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes
Page 9
What the September US$40m fundraise makes possible Milestones achievable now to pre-construction start 7 1. Reserves, including short term treasuries, pre and post September 2026 Fundraise (as per 25 Sept RNS). Including US$1.1m cash in short term treasuries. 2. In addition to the reserves, the Company holds US$6.6m in deposits pledged as collateral for bank guarantees related to the c ompulsory acquisition of land and the acquisition of the Aldeia licence. Pre-fundraise Post-fundraise Reserves: ~US$14M1,2 Reserves: ~US$53M1,2 Milestones achievable (Target by end of March 2027): RECAPE work & submission (and approval) RECAPE work & submission (and approval) Geotech & Resource drilling Geotech & Resource drilling Land Control Land Control Community workstreams Community workstreams Final Investment Decision Final Investment Decision + Long lead item specification + downpayments* + Initial groundworks for access road* + Recruitment (~40 staff) + Project Finance completion and Fees + Additional working cap & 6 months buffer • *Part of the Project’s construction capital. ~US$20m of spending on items included in Project’s construction. • Remainder of planned spending directly supports Project development • Increased working capital provides additional financial security and flexibility Maintains current project timetable Results in delays to Project timetable savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes
Page 10
Current & upcoming work Progressing towards delivery of major milestones before year end 8 • Fieldwork: Final pre-construction drilling programme underway (geotechnical, hydrogeological and resource) • RECAPE: In advanced stages of preparation for submission later this quarter • FEED: Contractor selected, work programme underway on procurement and management of key long-lead equipment packages • Recruitment: Current phase targeting c.30 additional roles, expanding team by c.75% • Project Finance: Working towards conditional agreements by end of quarter • Offtake: Agreement with 2nd offtake to be finalised in current quarter • ISO 14001 Certification: Project achieved the ISO 14001 standard, the internationally recognised standard for environmental management systems savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes
Page 11
Acquired the Project 2017-19 Over 50,000m drilled to date 39Mt resource outlined Project redesigned Positive DIA received New Scoping Study Social studies done RECAPE work initiated DFS restarted SPP Process initiated First partner & offtake US$270m Ger Gov loan guarantee1 Classified as EU Strategic Project Completed resource drilling Updated resource estimate Project financing started Further team build out Continued strategic partnership discussions Progressed RECAPE & DFS €110m State Grant award Completion of DFS Second offtake partnership Conditional closure of Project Financing Construction team build out 2027 2026202520242023 Land access progressed DFS Phase 1 drilling 1st resource upgrade RECAPE work continued Local project team grown 2028 End of construction Commissioning Acceleration of work on additional resources & reserves First concentrate (EoY) Enviro. Conformity Check Final Investment Decision Construction Start Complete build out of operations team Operational readiness procedures Selective geology work Development schedule - Focused on delivery 9savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes1. Subject to final contract Task completed Task in progress
Page 12
@SavannahResinfo@Savannahresources.com Savannahresources.com Savannah Resources Questions (Pt 1)
Page 13
Agenda • Key messages • Fundraise wrap up & current/upcoming work • The main elements of the DFS • Financing Structure • Stakeholder engagement • Takeaways 11
Page 14
Barroso Phase 1 2nd quartile (705$/t SC6) 2030 Global lithium concentrate market All-in-Sustaining cost curve2 Phase 1 Definitive Feasibility Study Headlines Robust numbers confirming Savannah’s competitive position DFS Stage 1: Key Numbers1 20Mt Maiden JORC Reserve @1.0% Li2O US$ 516/t C1 costs SC6 equiv, 2nd quartile of Global Cost Curve US$ 705/t AISC SC6 equiv, 2nd quartile of Global Cost Curve 600ktpa2.6Mt Total Spodumene Concentrate Average annual by-product output 14 Years Initial Phase 1 Life of Mine 70%1.5Mtpa Throughput rate US$ 1788/t Average SC5.5 price US$ 418M Initial CAPEX (including contingency & pre-strip) Li2O recovery rate US$ 3.2Bn Total EBITDA US$ 1.9Bn Total Free Cash Flow 1.9 Years Post-tax Payback 43.2% Post-tax IRR US$ 913M Post-tax NPV8 121. As per RNS, 15 July 2026 2.Benchmark Mineral Intelligence, 2030 concentrate All -in-Sustaining cost curve including by-product credits (Lithium Total Cost Model Q2 2026) savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes 5.2:1 Average Strip ratio (Waste: ore)
Page 15
Further value upside Phase 2: Reserve growth, longer mine life • Convert more of the 39Mt Resource • Further work on exploration target of +35-62Mt2 Phase 3: potential capacity growth to 500ktpa SC Others: Process optimization, Productivity growth, Lateral value in by-products & renewables Benefits for the region ~500 New long-term on-site jobs, +1000 indirect & induced jobs US$61m Boticas bypass road and wider local infrastructure €500k p.a. Savannah Foundation community contribution Boticas bypass road included with the Project High Quality, Low Cost, Low Risk, Low Impact Mine & Plant processing to SC5.5%. 2nd quartile in global C1 & AISC cost curves, while complying with EU regulations. Open-pit, conventional processing, dry-stack tailings, autonomous water sourcing & recycling, low carbon grid power, progressive full rehab & closure included. By-products important for Iberia’s ceramics & other industries. Catalyser of region’s population recovery & economic growth. 183kt average annual SC5.5 production Processing Plant Tailings Storage Facility Open pit mining ~20km away to the NE Offices & Exit Road Trucking Overview: Barroso Lithium Project Phase 1 DFS1 World-class results with significant value from the first 20Mt Lithium for 7M+ EV batteries Lithium contained in Phase 1 supports Europe’s battery revolution and clean mobility supply chain at scale 13savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes 1. As per RNS, 15 July 2026 2. Cautionary Statement: The potential quantity and grade of the Exploration Targets is conceptual in nature, there has been ins ufficient exploration work to estimate a mineral resource and it is uncertain if further exploration will result in defining a mineral resource ; Note: the industrial footprint illustration is partially AI -generated ROM pad Mine & Plant
Page 16
Significant additional value remains to be unlocked As Phase 1 (Post-tax NPV8 US$913M) moves into construction Time Processing plant considered in DFS already contemplates further industrial expansion Project Optimizations | Productivity Improvements | Downstream Partnerships Renewables, Automation, Electrification | By-product Opportunities Multiple pathways remain available to materially increase project value through reserve growth, mine life extension, production expansion and operational optimization – but the priority for now is delivery PHASE 1 183ktpa SC plant • Online late 2028; 20Mt Reserves, 14yrs LOM @ 183ktpa, $913M NPV PHASE 2 Reserve Growth, further Geology • 39Mt Resource + 35-62Mt Expl. Target • In parallel: Upgrade of Inferred material + Further drilling, esp. in Aldeia + Minor area growth in Reservatório • Target >40 yrs LOM (x3), >100Mt (x5) PHASE 3 Industrial Expansion, Economies of Scale • Plant duplication potential: crushing, pads, water circuit, roads built with spare capacity in Phase 1. • Further throughput growth possible, to be assessed post-production start • Other plants for by-products possible, in partnership with sector experts • Target 3MTpa+ (x2+) 141. As per RNS, 15 July 2026 savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes
Page 17
Capex: Total of US$418m including pre-strip & contingency US$323m required net of US$95m contribution from State Grant 13 25 11 05 04 05 09 16 09 09 61 04 03 25 93 53 07 350 27 378 40 418 Contractor indirects Owners costs General site wide and bulk … Haul roads Plant mobile equipment Buildings infrastructure Tailings storage facility Ponds Power supply Access roads Bypass road Land acquisition Spares and first fills EPCM Processing plant supply Processing plant install Freight Total Capex Capitalised Pre-strip cost and G&A Total Contingency (over Capex) Grand Total US$m 00 50 100 150 200 250 300 350 400 450 323 - 95 15savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahResAs per RNS, 15 July 2026 Grant Capital required net of Grant
Page 18
Opex: In 2nd quartile of the 2030 global cost curve1 With a SC5.5 C1 cost of US$473/t and an AISC2 of US$646/t 275 194 27 64 - 88 473 169 642 56 92 790 25 - 169 646 16savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes As per RNS, 15 July 2026; 1. Benchmark Mineral Intelligence, 2030 concentrate C1 and All -in-Sustaining cost curve including by-product credits (Q2 2026); 2. All in Sustaining costs (AISC), including US$142m of royalties, US$237m of comprehensive closure costs (including pit backfilling) and US$65m of sustaining CAPEX net of S tate Grant milestone payments * * *SC5.5 C1 and AISC costs equivalent to SC6 costs of US$516/t and US$705/t respectively
Page 19
The Project is most geared to the spodumene lithium price ± 4-7% effect only of ±10% in Opex or Capex, low sensitivity to power or fuel costs +/-19% +/-7% +/-4% +/-1% 17savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahResAs per RNS, 15 July 2026
Page 20
Industrial area Flowsheet – conventional, low risk Process design highlights Designed by Sedgman-Minsol Simple DMS + Flotation to produce a very clean SC5.5% Li2O Reagents are all environmentally friendly & EU Reach compliant Plant located to reduce noise & visual impact on local communities Primary crushing 100% covered 70% initial recovery rate target. Focus on optimisation post start up Onstream analysers, redundancy in equipment that are key for availability 18savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahResAs per RNS, 15 July 2026
Page 21
4. Drill & Blast 5. Excavation & Truck loading 7. Ex-pit hauling (Ore) 6. Ex-pit hauling (Waste) 10. Spodumene & By- products dispatch 11. Dry-stacked tailings hauling and placement Industrial area From access & offices to plant, dispatch & TSF Mining schedule profile 1. Access road 2. Power substation 3. Offices & facilities 9. Lab, Reagents & Water treatment 8. Plant: Crushing, DMS, Flotation 19 savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahResAs per RNS, 15 July 2026
Page 22
Industrial footprint Supporting Infrastructure & Mining areas 11km North access independent road includedExisting power line rerouting, connection & substation (80% Renewable power) 6 water reservoirs: autonomous collection, storage & recycling TSF & Waste Areas: Dry-stack tailings, waste volume reduced by sales of by-products, used in sequential rehabilitation NOA Reservatório Pinheiro Grandão Aldeia Plant 20savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahResAs per RNS, 15 July 2026 17km shared Boticas bypass road included
Page 23
Industrial footprint Potential expansion within hauling distance Plant area 1.5 km 6.5 km 21savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahResAs per RNS, 15 July 2026
Page 24
Critical path to production, 2027–2029 22savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes Activity Q1 2027 Q2 2027 Q3 2027 Q4 2027 Q1 2028 Q2 2028 Q3 2028 Q4 2028 Q1 2029 Q2 2029 Q3 2029 Q4 2029 FID (final investment decision) North access road HV power Internal roads Water reservoirs Tailings storage facility (TSF) Bulk earthworks Process plant construction Process plant commissioning First concentrate Process plant ramp up Nameplate processing production Bypass road
Page 25
Agenda • Key messages • Fundraise wrap up & current/upcoming work • The main elements of the DFS • Financing Structure • Stakeholder engagement • Takeaways 23
Page 26
A clear path underway for >12 months now, with many options Funding – Project Finance well advanced to FID 2 alternative solutions through (i) KFW / a commercial bank syndicate with ECA support vs. (ii) pure Commercial Bank funding approach • Debt sized on lenders’ case, LLCR / DSCR and downside scenarios • Sculpted repayment profile aligned with project cash flows • Standard Project Finance security package • Reserve accounts, and typical CPs to drawdown being defined • Financial closing targeted up to Q1 2027 DFS-Based lender DD Project Finance Structure Already ongoing main Due Diligence packs for Lender’s approval • Technical DD • Environmental & Social DD • Market DD & Legal DD • … Key bankable requirements already stressed with potential Lenders • Majority of production contracted (Target c.70–75% of production under a LT offtake, min target 25% already in discussions with AMG) • Take-or-pay structure expected • Floor price may be required for part of the contracted volumes • Typical tenor around 5 years - some flexibility for shorter tenor on part of the volume • Still plenty of volume (~45ktpa) to sell at spot price Funding Enablers Offtake Strategy Government Grant • Already approved, final treatment within the funding structure still under review Equity • Required to fund LLIs, pre-financial close works and CPs 24savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes
Page 27
Agenda • Key messages • Fundraise wrap up & current/upcoming work • The main elements of the DFS • Financing Structure • Stakeholder engagement • Takeaways 25
Page 28
26savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes Local Engagement will continue to be a top priority Being part of the community, working for the good of the region ANNOUNCED Hunting & Fishing Associations of Boticas (incl. Covas), Canedo & Dornelas 3 Cooperation Agreements Covering the Entire Project Direct Area of Influence Health Regional Hospital Group Joint study for a new local healthcare facility MORE PARTNERSHIPS SECURED DETAILS TO BE ANNOUNCED 3 Local Government Authorities Local Development Association More to come further local initiatives & partnerships currently in discussion Breathing New Life into Barroso Mrs A Mrs B Mrs C Mr & Mrs D Mr E Mr F Ms G Ms H 3rd new house in Covas 1st new house in Canedo … and much more 1st-time mom — Jul 26 Back from Ireland, with husband and baby Back from Porto with husband & a baby, after ~20 yrs away Gave up emigrating, moved to Carreira da Lebre Back from France emigration, rejoined family elders left behind Moved to Canedo with wife Moved to Covas Moved to Boticas 2 Communal Land related entities Local village Baldio groups, which manage land on Project Land access and rental, benefit sharing and community participation in Project monitoring Local Agriculture related NGO Management of 100Ha agro- forestry area owned by SAV Regional body representing hundreds of member entities across more than twenty municipalities Small Local Mine Social Sector Association Community Sports Association Local Faith-based Organisation Body responsible for parish church of Boticas Support for the parish's activities and preservation of local religious and cultural heritage.
Page 29
Agenda • Key messages • Fundraise wrap up & current/upcoming work • The main elements of the DFS • Financing Structure • Stakeholder engagement • Takeaways 27
Page 30
• Globally competitive – C1 & AISC costs in 2nd quartile of global cost curve2, lower than most producers, even in Australia, China, Africa; From within the EU; Achievable to-be- funded Capex (US$ 418M inc. contingency). Post-tax NPV8 US$913m & 43.2% IRR • Europe’s largest, Globally significant – Phase 1 DFS delivered , 20Mt Reserve, 14 years output at 183kt SC5.51, 39Mt Resource, Additional Exploration Target3 pointing to > 100Mt. Expansion capacity option built in and considered in DFS CAPEX • Validated & Supported at all levels – EU Strategic Project; Portuguese CPAI, Grant & Easements; German ECA & KfW LoI, Offtake with AMG (SC miner & LiOH refiner); Solid local ties & presence with >10 partnerships done; • Low execution risk, high optionality – Traditional Spodumene flow-sheet, Open pit; Experienced team; (slow but) very stable jurisdiction; ~US$53m in reserves4, clean balance sheet; 75% of the offtake unallocated & strongly supportive shareholder base • Post-DFS milestones & news flow ahead – Further value creation ahead. Project Financing, additional strategic partnerships, offtakes, community & other deals before year end. Production targeted for end 2028. …& then potential Phases 2 & 3 Porto Lisbon SPAIN EUROPE 1 2 3 4 5 28savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes 1. Data from July 2026 Phase 1 DFS; 2.Benchmark Mineral Intelligence, 2030 concentrate All -in-Sustaining cost curve including by-product credits (Q2 2026); 3. Cautionary Statement: The potential quantity and grade of the Exploration Targets is conceptual in nature, there has been ins ufficient exploration work to estimate a mineral resource and it is uncertain if further exploration will result in defining a mineral resource. 4. Pro-forma reserves position post September 2026 Fundraise (as per 25 Sept RNS). 5 Key messages on where we are right now Savannah’s “Barroso Lithium Project”
Page 31
Savannah Resources To Find out more A UNIQUE PROJECT PROGRESSING FAST, SUPPORT & VALIDATION BY ALL KEY EXTERNAL PARTIES NEWS-FLOW AHEAD DFS & Reserve PT Government 10+ local Deals Validated by globally recognized sector experts July 2026 €110m grant awarded + AICEP / CPAI support + Easement & Resolution Sep 25, Jan & May 26 Cooperation agreements with various local entities January to Aug 26 visit: savannahresources.com view: #EnergyofBarroso Join our mailing list Visit us in Boticas, Portugal Rating: Buy Price Target: 16.5p SP Angel Rating: N/A Price Target: 9.4-19.9p CaixaBank-BPI Rating: Speculative Buy Price Target: 11p Canaccord Sept 26Sept 26 Sept 26 Rating: N/A Price Target: 9.8-18.7p Alantra Sept 26 European Com. Selected as a Strategic Project under CRMA March 25 29 Rating: BUY Price Target: 14.2p CaixaBI Sept 26
Page 32
@SavannahResinfo@Savannahresources.com Savannahresources.com Savannah Resources Questions (Pt 2)
Page 34
@SavannahResinfo@Savannahresources.com Savannahresources.com Savannah Resources APPENDICES
Page 35
@SavannahResinfo@Savannahresources.com Savannahresources.com Savannah Resources Board & Management
Page 36
Michael McGarty CCO 30 years of international financial management experience Key Team FOR PROJECT DELIVERY IS BEING SET UP Key Staff to Deliver the Project Accumulated Experience includes Boris Daza Development Manager 20 years of experience in development of mining projects Asa Bridle Head of IR 26 years experience across geology, commodities, equities & IR Egídio Ribeiro Project Financec.18 years experience in project financing Michael Tamlin Offtake & Commercial Lithium industry expert with 30+ years in executive roles Diogo Maia Community Relations Manager 10 years experience. PhD in Development Studies and Social Performance Expert Henrique Freire CFO 9 years as CFO in a listed company & M&A background Savannah Team stats: • c. 40 staff • 85% based full time in Portugal • 63% located in Boticas • > 180 years of accumulated experience in mining, geology, lithium and finance John Morris Pereira Exploration Manager 25+ years in Geology, leading teams & drill campaigns Emanuel Proença CEO 10 years in CEO and senior leadership roles including in alternative fuels & mobility João Nunes Operations Readiness Manager 28+ years in mining including in Portugal and Spain Sonia Coelho Environmental Manager 20 years in environmental studies, permitting processes & post- assessment compliance 34savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes Mineral Resources Aurora Lithium Almina Fortescue EDP Lundin Mining
Page 37
Key Team ESTABLISHED FOR PROJECT DELIVERY Board Members Rick Anthon Chair 30+ yrs as an Exec & Lawyer. 10 yrs in Lithium with Orocobre /Allkem from IPO to 2023 US$11Bn merger with Livent Diogo da Silveira Deputy Chair 20 years in top CEO roles in Portugal/Europe, Seasoned NED & former McKinsey Partner Bruce Griffin NED 20+ years in mining finance, holding executive and NED positions in the industry Paulo Pinto NED 30+ years of leadership in the banking and financial services industry. Executive Board Member at Pluris Investments Emanuel Proença CEO 10 years in CEO and senior leadership roles in Portugal, including in alternative fuels & mobility Mohammed Sulaiman NED 20+ years in Strategy & Investment Management; served on multiple public & private boards. SAV Audit & Risk Committee Chair Mike Connor NED Chief Corp. Dev. Officer & Board member at AMG. 20+ years in finance, Corp. Dev & Strategy 35savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes
Page 38
@SavannahResinfo@Savannahresources.com Savannahresources.com Savannah Resources Reserves, Resources & Exploration Target
Page 39
Inclusive of Reserves, 0.5% Li2O cut-off grade Based on SC6 price of US$1,200/t, 0.5% Li2O cut-off grade JORC Resource Classification (Apr-26) Tonnage (Mt) Li 2O Grade (%) Fe2O3 grade (%) Measured 8.7 1.06 0.7 Indicated 18.1 1.05 0.8 Inferred 12.3 1.04 0.8 Total 39.2 1.05 0.8 37savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes 1. See 15 July 2026 RNS. 2. See 15 July 2026 RNS. 3. See 15 Sept 2025 RNS. 4. Cautionary Statement: The potential quantity and grade of the Exploration Targets is conceptual in nature, there has been ins ufficient exploration work to estimate a mineral resource and it is uncertain if further exploration will result in defining a mineral resource. Reserves, Resources & Exploration Target Potential to reach 100Mt+ in the long term across the Concessions JORC Reserve Classification (Jul-26) Tonnage (Mt) Li 2O Grade (%) Fe2O3 grade (%) Probable 20.0 0.99 1.00 Total 20.0 0.99 1.00 Reserves & Resources Over 50,000m of drilling completed to date Today: 20Mt JORC Reserve1, out of 39Mt JORC Resource2, including 27Mt in Measured & Indicated categories2 39Mt Resource (c.409kt Li2O contained) equates to >1Mt Lithium Carbonate Equivalent (~40 yrs of average refinery output at 25ktpa) All orebodies open along strike & down dip In addition Exploration Target of 35-62Mt at 0.9-1.2% Li2O3,4 Gives potential for 100Mt+ over time Covers extensions to existing orebodies and 8 additional targets inside the Concessions including the unexplored Aldeia Block C Exploration Target Tonnage Range (Mt) Li2O Grade (%) Total 35.0-62.0 0.9-1.2
Page 40
Now nearly 2x the next biggest project in terms of in-ground resources1 Unrivalled as a spodumene project in the EU in terms of scale Today ~40Mt 21 million EVs2 Future 100Mt ? 54 million EVs2 Equivalent to PT + SP + NED + BEL + GRE total passenger cars, or More than the German market3 2.4x Total Portuguese car sales2 Phase 1: 500K EVs equivalent to… 1.5xAnnual Portuguese vehicle production2 34% Of BEVs sold in Europe in 20242 Decarbonizing at multi-country scale 38savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes 1. Based on company data and analysis; 2. Company analysis based on in-ground JORC Resources and Exploration Targets (Sept 2025) and assumed 60kWh EV battery size. Cautionary Statement: The potential quantity and grade of the Exploration Targets is conceptual in nature, there has been insufficient exploration work to estimate a mineral resource and it is uncertain if further exploration will result in defining a mineral resource. 3. Eurostat 2024 Passenger car data
Page 41
@SavannahResinfo@Savannahresources.com Savannahresources.com Savannah Resources Peer group valuation
Page 42
0.24x 0.46x 0.32x 0.36x 0.49x 0.32x 0.27x 0.16x 0.34x 0.50x 0.84x 0.30x 0.73x 0.42x 0.26x 0.87x 0.57x 0.36x 0.70x 0.56x 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 SAVANNAH RES Critical Elements Frontier Lithium Galan Lithium Lithium Americas PMET Resources Standard Lithium Vulcan Energy Average (ex-SAV) Albemarle Core Lithium Elevra Lithium IGO Liontown Res. Lithium Argentina Mineral Resources PLS Group Sigma Lithium SQM Average Peer group comps imply significant upside ahead Lithium sector P/NAV metrics1,2 Value will continue to be delivered as new milestones are passed 40savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes 1. P/NAV (Market Capitalization/Net Asset Value) multiples based on Canaccord Genuity, ‘Global Specialty Metals Comps’ 6 Oct 2026 and Jefferies research notes on ALB, MIN, SQM May -26, Aug-26 and Sep-26; 2. SAV P/NAV metric based on Mkt Cap on 7 Oct 2026 and Post-tax NPV8 of US$913m from Phase 1 DFS (15 July 2026). +41% vs. peer average +130% vs. producers Post DFSProducers Additional value levers Not reflected in the multiples above Further partnerships Reserve & capacity expansion +/- Lithium price swings
Page 43
@SavannahResinfo@Savannahresources.com Savannahresources.com Savannah Resources Global & European lithium market overview
Page 44
0 1,000 2,000 3,000 4,000 2026e 2027e 2028e 2029e 2030e 2031e 2023e 2033e 2034e 2035e LCE (000t) Global Lithium Supply & Demand outlook1 Industrial demand Battery demand Total supply Lithium is in high demand with long-term drivers in place Conditions for ramping up in 2029 should be optimal 1. Supply & Demand forecast from Canaccord’s lithium sector note (Apr-26); SC6 consensus price (FOB Portugal) from in Jul-26 DFS; SC6 spot price (S&P Global Platts FOB Australia, US$2,275/t 31 Aug 2026) Tightening market conditions expected from 2026 - Global shortage expected to increase Local sourcing gaining importance with growing global geopolitical tension Savannah First Production 41
Page 45
The macro-trends shaping lithium demand are unstoppable 1. Electric Vehicle (EV) Proliferation: o The automotive sector is the bedrock of demand. Lithium remains the foundational component of batteries. Increasing battery sizes and advanced high-nickel chemistries (e.g., NMC 811) as well as cost-effective Lithium Iron Phosphate (LFP) platforms requires massive volumes of lithium carbonate and lithium hydroxide o Electric heavy-duty vehicle: Electric truck sales doubled in 2025 to reach 9% of truck sales worldwide. In 2025, 25% of all the heavy trucks sold in China were electric — basically in line with analysts’ forecasts for 2030 o Sales of electric buses reached almost 70 000 globally in 2025, growing 12% year-on-year. Battery electric city buses reached a share ofover 55% in 2025 in the European Union, up from around 45% 2. The Rise of Grid-Scale Battery Energy Storage Systems (BESS): o Renewable energy integration has sparked a surge in stationary and co-located BESS, which rely on lithium-ion technology to store intermittent power from solar and wind, to offset curtailment and zero/negative captured power prices o General Electrification: with subsequent need for grid-stabilization, grid-modeling, intraday-trading o Datacenters require special BESS, as instant backup power in case of emergencies and redundancies, as support to AI workload spikes or grid stabilization, and as cost optimization tools 3. Geopolitics and Reshoring Supply Chains: o Western governments now classify processed lithium as a critical national security issue. U.S. Critical Minerals framework, EU CRMA, push for domestic refinement to reduce reliance on the Asian-Pacific supply chain o Reshoring strategy to navigate regulatory export bans (such as those in Zimbabwe) and optimize logistics, major lithium producers are increasingly developing intermediate products - like lithium chloride and lithium sulphate - to ship to downstream refiners closer to the end user 42
Page 46
The Critical Raw Materials Act (CRMA) “will ensure EU access to a secure and sustainable supply of critical raw materials, enabling Europe to meet its 2030 climate and digital objectives”2. Highlights of the CRMA include: • Lithium classified as both a Critical & Strategic material (feldspar classified as critical) • Minimal domestic capacities by 2030: >10% of the EU's annual consumption for extraction; >40% for processing; >25% for recycling • The Act will simplify permitting procedures for critical raw materials projects in the EU (2yrs for extraction projects) • Selected “Strategic Projects” will benefit from support for access to EU finance (EIB, programs, etc.) Additional European policy pillars include the ‘RESourceEU Action Plan’ (2025) and the ‘Industrial Accelerator Act’ (2026) “Both the Covid pandemic and war in Ukraine have highlighted the fundamental need for resilient industrial value chains, including batteries, for the EU’s economic growth and decarbonisation as well as for its strategic autonomy…”1 Li Raw Material Extraction UPSTREAM DOWNSTREAM - THE LITHIUM BATTERY VALUE CHAIN - Chemical Refining Active Materials Cell/Pack Manufacture Use Recycling MIDSTREAM Savannah’s BLP Phase 1 is set to deliver 87%3 of this target by itself, from 2029 Europe is taking action, with global participation Creating its own ‘Lithium Battery Value Chain’ 43savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes 1. Joint Statement, High-level Industrial Meeting of the European Battery Alliance, March 2022; 2. Critical Raw Materials Act; 3. Based on Canaccord Genuity estimate of 300kt LCE European demand in 2030 from Savannah research 6 May 2025
Page 47
Speeding up to serve the sector as quickly as possible from 2028 & into 2030s 2000+ direct & indirect jobs created locally, part of c.1.5 Million jobs2 throughout the EU value chain by 2030 Iberia will contribute strongly to building Europe’s lithium value chain Iberia has all the key ingredients 19% of EU vehicle production, cheap renewable energy, skilled labour force, ¼ of EU’s CRMA strategic projects, low sovereign risk and a strategic fit with EU’s ambitions SAV-AMG link is a great 1st step EU’s largest spodumene lithium resource partnered with an experienced lithium miner & EU’s largest lithium refiner, …and another 50-75% SC to be allocated1 Sector is accelerating in Portugal A value chain that includes miners, refineries, batteries, EVs and others: all together, the opportunity can represent up to an additional 10% of GDP Refining Batteries/CAM Automotive Mining 44savannahresources.com | #EnergyofBarroso | info@Savannahresources.com | @SavannahRes1. Based on offtake heads of terms agreement with AMG as per RNS 20 June 2024 2. Fraunhofer Institute for Systems and Innovation Research ISI
Page 48