Slides
Page 1
Procurement & Supply Chain
Page 2
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 2 2-g.com How can 2G deliver the Next Stage of Growth? Operational answer on the growth story: • Space physical capacity and campus expansion • Flow industrialized manufacturing and shorter lead times • Resilience supplier capacity, flexibility and quality gates
Page 3
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 3 2-g.com Development Campus Heek: Removing the First Bottleneck Yesterday Today Parking 10/2026 Hall 7 03/2026
Page 4
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 4 2-g.com Heek tomorrow: capacity headroom through campus expansion Tomorrow New Production Largest single investment in the history of 2G
Page 5
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 5 2-g.com Heek tomorrow: How Fast Can It Go? March 2025 March 2026
Page 6
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 6 2-g.com Designing the Product for Industrial Scale Standardization & modularization | Defined interfaces, fewer bespoke variants, recurring assemblies. Prefabrication | Sub-assemblies are built, tested and fed into the line. Flow-oriented design | Product architecture follows station logic and material flow. Repeatable quality | Built-in checks, clear standards and less rework at scale. • Less movement • Less waiting • Less rework • Shorter lead time
Page 7
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 7 2-g.com Designing the Product for Industrial Scale All complexity from heat distribution is taken out of the container, put inside a premanufactured heating distribution frame Optimized design for exhaust gas emission system to less space and less interfaces
Page 8
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 8 2-g.com Designing the Product for Industrial Scale • Product design follows the assembly sequence • Balanced workload along the line • Rail-based flow line • Containerlifter with capacity of 80t
Page 9
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 9 2-g.com Supply-chain Resilience: No Single Crisis Stops Growth Diversified where possible, integrated where critical.
Page 10
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 10 2-g.com Supply-chain Resilience: No Single Crisis Stops Growth Dual Sourcing | reducing single-source dependencies Regionalization & Local Content | sourcing closer to our markets Selective Vertical Integration | securing supplier capacity ahead of growth Long-term Capacity Security | Long running supply contracts and paid slot reservations M&A of GMO → Know How and Supply Chain for Gas Engine parts M&A 50% of LC Systems → 2G’s Containers
Page 11
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 11 2-g.com avus2000e (MTU) avus1500b (Jenbacher) avus1000plus (2G) Flexible Product Platform | alternative engines and components Critical Material Strategy | substitution and strategic sourcing of critical materials Business Continuity & Quality | alternative routes, contingency concepts and supplier quality assurance Supply-chain Resilience: No Single Crisis Stops Growth
Page 12
2G Capital Markets Day | Procurement & Supply Chain 07.10.2026 │ 12 2-g.com Key Takeaways ▪ Capacity ahead of growth campus expansion creates the physical headroom to scale production ▪ Industrialization drives scalability DfM, standardization and flow production reduce manufacturing effort and increase throughput ▪ Flexible Platform reduces dependency multiple engine options strengthen customer flexibility and supply-chain resilience ▪ Supply-Chain secured proactively dual sourcing, regional networks and selective integration secure critical capacity for future growth
Page 13
Thank you very much for your attention