Slides
Page 1
Exploration of high-grade gold mineralisation in world-class terranes of Côte d’Ivoire 121 Mining Investment Conference – Cape Town February 2026 Aggressive exploration program funded and underway INVESTOR PRESENTATION ASX:MPK For personal use only
Page 2
2 Disclaimer and Cautionary Statement This Presentation has been prepared as a summary only and does not contain all information about Many Peaks Minerals Limited’s (“MPK” or the “Company”) assets and liabilities, financial position and performance, profits and losses, prospects and rights and liabilities. The information in this Presentation and made to you verbally is subject to updating, completion, revision, further verification and amendment without notice. The information contained in this Presentation or subsequently provided to the Recipient of this Presentation whether orally or in writing by or on behalf of the Company or its employees, agents or consultants ("Information") is provided to the Recipients on the terms and conditions set out in this notice. The purpose of this Presentation is to provide Recipients with Information relating to the Company. The Presentation has been prepared by the Company and each Recipient must make his/her own independent assessment and investigation of the Company and its business and assets and should not rely on any statement or the adequacy and accuracy of any Information contained in this Presentation. The Company makes no representation or warranty (express or implied) as to the accuracy, reliability or completeness of the Information. The Company and its directors, employees, agents and consultants shall have no liability (including liability to any person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or implied) arising out of, contained in or derived from, or for any omissions from the Presentation, except liability under statue that cannot be excluded. The performance and operations of the Company may be influenced by a number of factors, many of which are outside the control of the Company. No representation or warranty, express or implied, is made by the Company or any of its directors, officers, employees, advisers or agents that any intentions, expectations or plans will be achieved either totally or partially or that any particular rate of return will be achieved. This Presentation does not constitute in any way an offer or invitation to subscribe for securities in the Company pursuant to the Corporations Act. Statements regarding the Company’s plans with respect to its mineral properties are forward-looking statements. There can be no assurance that the Company’s plans for development or proposed exploration activity will proceed as currently expected. There can also be no assurance that the Company will be able to confirm the presence of mineral deposits, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of the Company’s mineral properties. The information in this report that relates to Exploration Results is based on, and fairly represents, information compiled by Mr Travis Schwertfeger, who is a Member of the Australasian Institute of Geoscientists. Mr Schwertfeger is the Managing Director of the Company and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves” (JORC Code). Mr Schwertfeger consents to the inclusion in this report of the matters based upon his information in the form and context in which it appears. References may have been made in this announcement to certain past ASX announcements, including references regarding exploration results. For full details, refer to the referenced ASX announcement on the said date. The Company confirms that it is not aware of any new information or data that materially affects the information included in these earlier market announcements. Released with the authority of the board of Many Peaks Minerals Limited.For personal use only
Page 3
3 3 Maiden Mineral Resource Estimation planned Q2, 2026 to underpin bulk tonnage potential of the Ferké Gold Project Investment Highlights Aggressive exploration program, >50,000m of drilling completed at Ferké first season, intercepts include, 45m @ 8.58g/t & 75m @ 6.11g/t gold (ASX releases 17 March & 11 August 2025) Expanding Project Pipeline held in Côte d’Ivoire, a stable and attractive mining investment jurisdiction, with West Africa the fastest growing gold producing region globally 94% Recovery in preliminary Metallurgy test-work at Ferké, indicates non-refractory mineralisation amenable to leach recovery Experienced Board with track record of discovery success and mine development in West Africa. Pre-feasibility study in the quickest discovery-to-production gold development region globally planned for completion in Q4 2026 For personal use only
Page 4
4 Many Peaks progress since acquisition in May 2024 0 0.5 1 1.5 2 2.5 0.000 0.200 0.400 0.600 0.800 1.000 Volume (M) Share Price (AUD) 201m @ 1.12g/t Au 230m @ 1.20g/t Au 64.5m @ 6.11g/t Au 84.8m @ 3.01g/t Au 55m @ 2.85g/t Au ASX Announcement (Ferké Diamond Results) MPK Director(s) Buying 45m @ 8.58g/t Au 35m @ 3.81g/t Au May 2024 Ferké & Odienné Project Acquisition Baga Project Acquisition March 2025, 1st Diamond Results at Feré Nov 2025, 94% Recovery in initial Metallurgy July 2025, Ferké South Expansion 1st Drilling Campaigns Complete at Odienné Refer to ASX releases dated 7 October, 4 September, 11 August 2025, 15 July, 24 June, 20 May, 17 March 2025) For personal use only
Page 5
5 Company Snapshot Shareholder Summary Board & Management (fully diluted) 13.6% Institutional Investors 9% Top 20 Shareholders 58% Top 100 Shareholders over 83% Capital Structure Share Price (6 February) A$0.865 Current Shares on Issue 133.1M Unlisted Options (EX A$0.25 to A$1.00) 15.8M Performance Rights 7.6M Market Cap. (undiluted) A$115M Cash and Investments (as at 31 Dec 2025) A$12.9M 52 Week Trading Range A$0.25 – A$1.05 Board – Successful West Africa Background Francis Harper Non-Executive Chairman Marcus Harden Non-Executive Director Travis Schwertfeger Managing Director Ben Phillips Non-Executive Director Matthew Scully COO & Executive Director For personal use only
Page 6
6 Tidiane Konaté Principal Geologist Management Team Successful West Africa Background Matthew Scully COO & Executive Director Mr Scully brings over 20 years of technical and operational leadership in the minerals sector, with deep expertise in feasibility studies, project development and mine operations. Previous senior roles held at Perseus Mining, and Evolution Mining Limited, and most recently, Project Director with West African Resources and commissioned the 8.4 Mtpa Kiaka Gold Project in Burkina Faso ahead of schedule and under budget. Mohamed Niaré Country Manager With over 25 years’ experience in the mining and exploration sector, Mohamed has provided tenement management, corporate governance, logistical support and community engagement for multiple public and private West African focused companies. Previous senior administrative roles in with West African focussed mining companies including Newmont, Randgold and Resolute. Jean-jacques Ettien Accounting / Hr – Côte D’ivoire Mr Ettien works in the fields of Accounting, Finance and Human Resources with experience across the West African sub- region, in various exploration and service companies in the mining sector. Graduated from the National Institute of Economic and Accounting Techniques of the Conservatoire National des Arts et Métiers de Paris (Intec Paris), from EMLYON BUSINESS SCHOOL, and holds two specialized master's degrees in Finance and Human Resources (Pigier Côte d'Ivoire and Félix Houphouët Boigny University). Travis Schwertfeger Managing Director +25yrs global minerals sector experience in project development, mining operations, exploration and resource estimation, including over 8 years' operating in West Africa. A Former Director of Exore Resources (acquired by Perseus Mining in 2020) and previously held roles with Newmont Mining Corp., Hecla Mining, and executive and non-exec roles with various ASX and TSX listed companies. He holds a BSc from the Colorado School of Mines and a MSc from the University of Western Australia. Qualified Geologist with >10 years’ exploration experience, holding a degree in geological engineering from the Institut National Polytechnique-Félix Houphouët-Boigny (INP-HB). Previous exploration experience includes former role with Barrick Mining and spans across opportunities in Egypt, Mali and Côte d’Ivoire. For personal use only
Page 7
7 Ferké Gold Project For personal use only
Page 8
8 Ferké Gold Project • Focused Diamond Drilling: 2025 Drilling significantly expanded volume potential at Ouarigue prospect, Results include: o 75m @ 6.11g/t gold from 427m including 7.07m @ 52.9g/t o 45m @ 8.58g/t gold from 104m (within 107m @ 4.13g/t) o 47m @ 3.72 g/t gold from surface – FNDC012 • Preliminary Metallurgy: 94% average recoveries from bottle roll tests indicate non-refractory mineralisation amenable to cyanide leach processing methods • Maiden Mineral Resource Estimation: anticipated Q2 2026 • Pre-feasibility Study: anticipated Q4 2026 • Regional Exploration: o >37km mineralised corridor, multiple drill-ready targets for RC and diamond drilling testing in 2026 field season o >15,000m campaign in progress, Ferké north o Ferké South permitting advancing – committee of ministers’ approval late 2025 and drilling pending signing of presidential decree Emerging Discovery with Extensive Exploration Upside Refer to ASX releases dated 26 March 2024, 17 March, 3 July, 11 August, 6 November 2025, and 30 January 2026 For personal use only
Page 9
9 Ferké Gold Project OUARIGUE PROSPECT • 31.8m @ 3.37g/t gold, including 4.25m @ 16.1g/t gold (ASX release dated 7 October 2025) • 84.8m @ 3.01g/t gold, including 7.5m @ 9.27g/t gold (ASX release dated 4 September 2025) • 75.0m @ 6.11g/t gold, including 7m @ 52.9g/t gold (ASX release dated 11 August 2025) • 87.0m @ 1.67g/t gold, including 29m @ 3.46g/t gold (ASX release dated 15 July 2025) • 230m @ 1.20g/t gold, including 15m @ 3.21g/t gold (ASX release dated 24 June 2025) • 201m @ 1.12g/t gold, from surface (ASX release dated 20 May 2025) • 45.0m @ 8.58g/t gold, including 25m @ 14.8g/t gold (ASX release dated 17 March 2025) Diamond drilling focused on identifying the extent of gold mineralisation at Ouarigue 2025 diamond drilling increased strike extent and a 300% increase in vertical extent, increasing grades with depth.For personal use only
Page 10
10 OUARIGUE PROSPECT, SECTION 1,065,550N Ferké Gold Project Refer to ASX releases dated 26 March 2024, 15 July 2025, and 4 September 2025 550 550’ For personal use only
Page 11
11 OUARIGUE PROSPECT, SECTION 1,065,450N Ferké Gold Project Refer to ASX releases dated 26 March 2024,24 June 2025, 11 August 2025 & 7 October 2025 450 450’ For personal use only
Page 12
12 Ferké Gold Project LONG SECTION Results in first 9 months drilling return: • Extensions along strike • 300% increase in vertical extent • Increasing grades with depth >25,000m Diamond drilling completed in 2025 2025-26 Diamond and RC follow-up in progress – >15,000m drilling commenced in December, with initial Results Pending Refer to ASX releases dated 17 March 2025 & 4 December 2025For personal use only
Page 13
13 Ferké Gold Project RECONNAISSANCE EXPLORATION RESULTS ASX release dated 11 August 2025 – Results highlighted in red. Also refer to ASX releases dated 26 March 2024, 17 March, 20 May , 24 June & 15 July 2025 12,120m of air core and RC completed in 2025 >15,000m campaign of RC and Diamond – in Progress • Reconnaissance drilling targets 10km segment of the 37km mineralised corridor at Ferké • Significant gold intercepts returned on every line of RC/air core reconnaissance campaign on wide-spaced drilling (800m to 2400m spaced drilling) • >1km long target includes several >1g/t gold intercepts, and shallow air core drill holes ending in mineralisation. 2025 Regional Reconnaissance – Auger, Air Core, and RC drilling highlights multiple drill-ready targets Follow-up ground magnetics and RC drilling commenced late 2025 For personal use only
Page 14
14 Odienné Gold Project For personal use only
Page 15
15 Odienné Gold Project • Project covers significant extent of high strain corridor (Sassandra Shear) along Archean domain margin • Same tectonic corridor hosting: o Predictive Discovery’s 5.4Moz Bankan gold discovery o Resolute’s 2.2Moz ABC Project, and o Adjoining ground to the south with recent gold discoveries advancing at BBM and Charger prospects, Awalé-Newmont JV • Largely unexplored region emerging as a new exploration district attracting investment in a proven mining jurisdiction • Initial RC Drill Test completed in 2025, with peak assay results of 21m @ 1.21g/t gold from follow-up of >1km spaced air core drilling of open gold anomalies. Key Land Position in an emerging gold district of West Africa Refer to ASX release dated 26 March 2024 and 5 August 2025 For personal use only
Page 16
16 Odienné Gold Project • >30km of gold anomalism in the prospective Sassandra fault corridor, host to several discrete gold targets on mineralized structures. • First RC drilling completed mid-2025 comprised 3,794m in 32 drill holes including, 21m @ 1.21g/t gold • Multiple gold intercepts confirm and extend, extensive gold corridors at Zone A and Zone C targets Ground geophysics and follow-up drilling planned for 2025-26 Field Season Air Core & first-pass RC Drilling Results Yield Extensive Mineralised Structural Targets Refer to ASX release dated 20 August 2024, 24 February & 5 August 2025For personal use only
Page 17
17 Odienné Gold Project – Air Core & RC Drilling Results Multiple AC holes ending in gold mineralisation return a wider zone of gold mineralisation of 21m @ 1.21g/t gold in first-pass RC drilling Zone C, >3.8km of gold anomalism, OPEN IN ALL DIRECTIONS Undrilled target in magnetics ties into mineralised structure confirmed in reconnaissance RC and air core drilling. Zone A, >4km of gold anomalism, OPEN IN ALL DIRECTIONS For personal use only
Page 18
18 Baga Gold Project For personal use only
Page 19
19 Baga Gold Project • Early-Stage Exploration Project o 644km2, two granted permits • Reconnaissance mapping has identified occurrences of previously unmapped intrusions and shear corridors with coincident alteration and sulphide minerals Systematic Surface Geochemistry Campaign • IN PROGRESS Baga located ~21km west of 4.5Moz Assafou gold discovery (Tanda-Iguela Project / Endeavour Mining) Refer to ASX release dated 27 June 2024, 26 July 2024 and 1 July 2025 24 Month Option Agreement commencing 26 June 2024 Exercise of Option to acquire 100% interest: • 1.5M fully paid ordinary shares in MPK • US$1M in Cash or MPK Shares (20-day VWAP at time of issue) • Milestone Payment(s) of $1.25 per oz Au M&I resource For personal use only
Page 20
20 20 2026 Field Season – Funded Work Programmes Ferké Gold Project Q1 2025 Q2 2026 Q3 2026 Q4 2026 Drilling – Diamond and RC, >15,000m campaign Metallurgy and Geotechnical drilling campaigns Drilling - Follow-up Diamond and RC on District Scale Targets Ground Geophysics and Ferké South Geochemistry Maiden Mineral Resource Estimation (drilling cut-off approaching) Pre-feasibility Study (In Progress) Odienné Gold Project Expansion/Infill Geochemistry along Mineralised Trend confirmed in Drilling IP Ground Geophysics Follow-up Diamond and RC Drilling Baga Gold Exploration Systematic Soil Geochemistry – IN PROGRESS Reconnaissance Mapping and Rock Chip Follow-up Auger Drilling and Geochemistry campaigns For personal use only
Page 21
21 Summary • Côte d’Ivoire a top tier Jurisdiction for mineral development in West Africa, Fastest growing gold producing region over past decade and emerging as the largest global gold producing region1 • Exposure to World Class West African Birimian Gold Terranes, with Côte d’Ivoire’s >34% portion of the highly gold endowed region significantly under-explored • Strong Board and Management team with significant West African Discovery and Development experience • Recent Exploration Success being rapidly developed with next key milestones – Maiden Mineral Resource Estimation, Q2 2026 – Pre-feasibility Study, Q4 2026 • Preliminary Metallurgy - 94% recoveries indicate non-refractory mineralisation amenable to low-capex and potentially low-cost leach recovery processing methods • Aggressive exploration campaigns for 2025-26 field season planned and fully- funded, building on success from modern, systematic staged exploration work West Africa includes: Burkina Faso, Côte d’Ivoire, Ghana, Mali, Senegal, and Guinea. 1) Source: World Gold Council Annual Gold Production by region (2022) For personal use only
Page 22
Contact Us Travis Schwertfeger Managing Director +61 (8) 9480 0429 info@manypeaks.com.au Many Peaks Minerals @ManyPeaksASX www.manypeaks.com.au Alex Cowie Investor Relations/Media NWR Communications alexc@nwrcommunications.com.au For personal use only